Home Eildon Systems - THE PRODUCTION EFFICIENCY SPECIALISTS

Up
Picture
How & Why
Reasons
ROI
Model 120
Model 120A
Model 130
Model 130 RG
Model 140
Model 150
Model 170

click for a larger picture

CheckMate

Model 130

Training Unit

For controlled training situations.  Set the individual training target daily and monitor improvement against the normal training curve. Reduces training times by approximately 20%.

This model is for use in controlled training situations or advancing high performance operators.

The operators Target Performance (%) for the day is keyed in, as is the standard minute value (SMV) for the operation.

Using the Target Performance (%) and the standard time (SMV) for the operation the CheckMate automatically calculates the Target Allowed Time, then the Target display is used to pace the operator at the expected output for the current level of training.

The Performance displayed is always the true percentage achieved against standard.